1 |
M |
8/23/21 |
Fourier analysis |
August 23 |
1.4-1.5 |
Fourier Theory |
0. Introduction (soldering tutorial here) |
Virtual |
2 |
W |
8/25/21 |
Modulation theorem |
August 25 |
1.6 |
|
|
|
3 |
F |
8/27/21 |
DSB modulation and demodulation |
August_27 |
1.6 |
|
|
|
4 |
M |
8/30/21 |
Nonlinear modulation |
August_30 |
1.7 |
|
NO LAB |
|
5 |
W |
9/1/21 |
Quadrature modulation/demodulation |
September 1 |
1.8 |
|
|
|
6 |
F |
9/3/21 |
Regenerative receivers |
September 3 |
2.1.3 |
Single Sdb Modulation |
|
|
|
M |
9/6/21 |
LABOR DAY - NO CLASS |
|
|
|
NO LAB |
|
7 |
W |
9/8/21 |
Superheterodyne receivers |
September 8 |
2.3 |
Bessel Functions |
|
|
8 |
F |
9/10/21 |
AM Broadcasting |
September 10 |
2.3.3 |
FM demodulation |
|
|
9 |
M |
9/13/21 |
FM Broadcasting |
September 13 |
2.3.4 |
Radio Broadcasting |
1. Discrete component modeling ( C1, C2, L1, L2, L3, R1, R2) |
Virtual |
10 |
W |
9/15/21 |
Up- and down-conversion |
September 15 |
2.3.5 |
|
|
|
11 |
F |
9/17/21 |
Software defined radio |
September 17 |
2.5 |
|
|
|
12 |
M |
9/20/21 |
Resonance |
September 20 |
4.1-4.2 |
|
2. Amplitude Modulation and Frequency Mixing ( LTDZ SA App Notes ) |
In lab |
13 |
W |
9/22/21 |
Quality factor Q |
September 22 |
4.3-4.5 |
|
|
|
14 |
F |
9/24/21 |
Oscillator analysis |
September 24 |
5.1-5.4 |
Oscillators |
|
|
15 |
M |
9/27/21 |
Colpitt, crystal, voltage-controlled oscillators |
September 27 |
5.5 |
|
2. Amplitude Modulation and Frequency Mixing (cont.) |
Virtual |
16 |
W |
9/29/21 |
Oscillator phase noise |
September 29 |
5.6 |
|
|
|
17 |
F |
10/1/21 |
Network power transfer |
October 1 |
6.1 |
|
|
|
|
M |
10/4/21 |
EXAM 1 - Solutions |
|
|
|
3. Amplitude Modulation - FM Transmitter |
Virtual |
18 |
W |
10/6/21 |
Lossless matching networks |
October 6 |
6.1 |
|
|
|
19 |
F |
10/8/21 |
Impedance matching with lossless L-networks |
October 8 |
6.2 |
Transmission Lines |
|
|
20 |
M |
10/11/21 |
Three-element matching networks |
October 11 |
6.3 |
Smith Chart |
4. FM Demodulator Design - Eagle PCB (ECE453.lbr) |
Virtual |
21 |
W |
10/13/21 |
Pi and T matching networks |
October 13 |
6.4 |
|
|
|
22 |
F |
10/15/21 |
Y, Z, H parameters, ABCD parameters |
October 15 |
7.1-7.4 |
Network parameters |
|
|
23 |
M |
10/18/21 |
S parameters |
October 18 |
8.1, 8.2 |
S Parameters |
5. Crystal Colpitts Oscillator (102C2X, 102C31, FS1024) |
Virtual |
24 |
W |
10/20/21 |
Application of S parameters |
October 20 |
8.3 |
Amplifiers |
|
|
25 |
F |
10/22/21 |
Stability analysis |
October 22 |
8.3.2, 8.3.3 |
Power Definitions |
|
|
26 |
M |
10/25/21 |
Unconditional stability |
October 25 |
8.3.4 |
Stability |
5. Crystal Colpitts Oscillator (cont.) |
In lab |
27 |
W |
10/27/21 |
Simultaneous conjugate match |
October 27 |
8.3.5 |
|
|
|
28 |
F |
10/29/21 |
LTI networks |
October 29 |
|
|
|
|
29 |
M |
11/1/21 |
Properties of LTI networks |
November 1 |
|
|
6. Voltage-Controlled Oscillator (varcap) |
Virtual |
30 |
W |
11/3/21 |
1-Port noise characterization |
November 3 |
10.1 |
|
|
|
|
F |
11/5/21 |
EXAM 2 - Solutions |
|
|
|
|
|
31 |
M |
11/8/21 |
2-port noise characterization |
November 8 |
10.1 |
|
7. Filters and Matching Networks (filter.s2p, Inductance App Note) |
Virtual |
32 |
W |
11/10/21 |
Noise factor and noise figure |
November 10 |
10.2 |
Noise |
|
|
33 |
F |
11/12/21 |
Mixers |
November 12 |
11.1-11.3 |
Mixers |
|
|
34 |
M |
11/15/21 |
Conversion loss in mixers |
November 15 |
12.1 |
|
8. Broadband Amplifier |
Virtual |
35 |
W |
11/17/21 |
Two-tone input |
November 17 |
12.2-12.3 |
|
|
|
36 |
F |
11/19/21 |
Modeling nonlinearities |
November 19 |
12.4 |
Nonlinearities |
|
|
|
M |
11/22/21 |
THANKSGIVING WEEK - NO CLASS |
|
|
|
NO LAB |
|
|
W |
11/24/21 |
THANKSGIVING WEEK - NO CLASS |
|
|
|
|
|
|
F |
11/26/21 |
THANKSGIVING WEEK - NO CLASS |
|
|
|
|
|
37 |
M |
11/29/21 |
Phase-locked loops |
November 29 |
13.1, 13.2 |
Phase-locked loops |
9. FM Receiver |
In lab |
38 |
W |
12/1/21 |
Transient response of PLLs |
December 1 |
13.3 |
|
|
|
39 |
F |
12/3/21 |
FM demodulation |
December 3 |
13.4 |
|
|
|
40 |
M |
12/6/21 |
Frequency synthesis with PLLs |
December 6 |
13.5 |
|
NO LAB |
|
41 |
W |
12/8/21 |
Phase detectors |
December 8 |
13.5.2 |
|
|
|
|
Th |
12/16/21 |
FINAL EXAM 1:30 PM- 4:30 PM |
|
|
|
|
|