CEE 498 CO4 - Case Histories in Infra Engr

Spring 2021

Official Description

Subject offerings of new and developing areas of knowledge in civil and environmental engineering intended to augment the existing curriculum. See Class Schedule or departmental course information for topics and prerequisites. Course Information: 1 to 4 undergraduate hours. 1 to 4 graduate hours. May be repeated in the same or separate terms if topics vary.

Section Description

Restricted to online non-degree, online MSCE, online MSEE, online MCS, online MSAE, online MSME, online MSIE, online ME, and online MEng students. Center for Innovation in Teaching & Learning (CITL) restrictions and assessments apply, see http://www.citl.illinois.edu. For more details on this course section, please see http://engineering.illinois.edu/online/courses/. Non-Degree students may enroll on a space-available basis with consent of Program Coordinator, Meg Griffin (mgriffin@illinois.edu).

Related Faculty

Subject Area

Civil and Environmental Engineering

Course Description

The two types of case histories to be covered in this course will be CEE problems that are unique and challenging and require interdisciplinary knowledge and skills to propose solutions and CEE failure investigations that uncover the mechanisms behind projects that didn’t work as they were originally designed. All case history projects involve design and construction issues as well remediation of the problems. All will involve in-depth investigation of the problems, recommendations of data to collect, evaluations of the data provided, and development of solutions to the CEE challenge or failure. Students will also form teams for a semester project and present their evaluation, data, and viable solutions at the end of the course. Students will be graded on quizzes, participation in discussions, and the oral and written presentation of the team case history project.

Case history examples included in the course are movement of the 5,000-ton Cape Hatteras lighthouse, movement of two 1,050-ton nuclear reactor pressure vessels across 46 miles of roadway, construction quality control issue such as acceptable in-place concrete strength and other construction materials, and roadway/airfield facilities that experienced premature failures.

Credit Hours

4 hours